Fontainebleau Hotel & Resort: Address: 4441 Collins Avenue
Miami Beach, Florida 33140
Architect/Engineer: HKS Architect
General Contractor: Turnberry Construction
Address: 19501 Biscayne Blvd.
Miami, Florida 33180
Construction Contact: Robert Naylor
Contract Value: $8,200,000.00
% Completed: 100%
Start date: July 2007
Completion date: January 2009
*Bonded Scope of Work:
Project included construction of 7 swimming pools, 4 fountains and 4 spas. Fontainebleau project was over 40,000 sq. ft of swimming pools and has intricate recirculation of plumbing and equipment.
Pool #2 Statistics:
Perimeter: 614 of Lf.
Capacity: 303,000 Gallons of water
Surface Area: 10,298 sq. ft.
*Currently the longest swimming pool in Florida.
The Ritz-Carlton, Palm Beach:
Address: 100 South Ocean Boulevard
Manalapan, FL 33462
Architect/Engineer: RTKL Associates Inc.
General Contractor: KMC Corporation
Address: 6601 Lyons Road, E6-7
Coconut Creek, FL 33070
Primary Construction Contact:
Ron Finger-Owner
Contract Value: $2,082,250.00
Project start date: June 2008
Completion Date: 03/2009
Scope: 14 Fountains and Men and Woman's Spa.
The Resort at Singer Island Project Address: 3700 N. Ocean Drive
West Palm Beach, Florida 33404
Property Manager: Starwood Hotels
Owner: WCI Communities
Owner's Contact: Steven Griggs
General Contractor: BCBE
Construction Contact: Mike Mac Donald
Completed: June 2007
% Completed: 100%
Contract Value: $2,000,000.00 Scope of Work: Project consisted of 9 bodies of water throughout the resort. 2 swimming pools- Lagoon swimming pool with beach front entry, waterslide and 15'x46' rock waterfall built of the 5th floor of high-rise, wet edge swimming pool with water cannons built on high-rise, spas, and 5 fountains.
Fort Lauderdale Grand Hotel & Yacht Club: Project Address: 1881 SE 17th St.
Ft. Lauderdale, Florida
Owner: The Blackstone Group
Architect/Engineer: EDSA
General Contractor: Greenfield Construction
Address: 1220 Riverland Road
Ft. Lauderdale, Florida 33312
Construction Contact: John Greenfield
Contracted Value: $1,200,000.00
Completed: December 2007
% Completed: 100% Scope of Work:
Project consisted of renovating 72,716 gallon hotel swimming pool (2,274 sq. ft)- 256 Lf. of new pool tile, 228 Lf. of Van Kirk coping, 228 Lf. of gem finish, 2,270 sq. ft of Diamond Brite Florida Gem. Van Kirk & Sons also provided new pool decking (16,800sq. ft.), paved hotel driveway (4,360 sq. ft.), and walkways, supplied pool lighting and new pool equipment room.
L.A. Fitness: Address: 10624 SW Village Pkwy
Port St. Lucie, Florida
Architect/Engineer: Quincy Johnson Jones Myott Williams Architects
General Contractor: Anderson-Moore Construction
Address: 1568 Watertower Road
Lake Park, Florida 33403
Construction Contact: Dave O' Donnell
Contract Value: $226,500.00
Completion: November 2007
Scope: Constructed 75ft. health pool w/ 4 swim lanes (slip resistant), tiled rollout gutter system, sand filtration system w/ chemical control system, Van Kirk bull-nose precast coping, gas heaters and gem finish. 13 ft. round health spa with therapy jets, spa filtration system and gem finish.
Journeys End: Project Address:Journeys End
6400 Journeys End Drive
Lake Worth, FL 33467
Owner: Westbrook Communities
General Contractor: Standard Pacific Homes
Construction Contact: Freddy Maranta
Contract Value: $268,000.00
% Percent Complete: 100%
Completion date: 03/2001 Scope of Work: Construction of community swimming pool:
Capacity: 60,000 gallons of water
Measurement: 32' x 85'
Square ft. 3,400 sq. ft
Perimeter: 286 Lf.
24 Hour Fitness Shaq-Sport; Town & Country: Address: Town & Country
8400 Mills Drive
Miami, FL 33183 Architect/Engineer: DRMP General Contractor: GSD Contracting Address: 4675 Anglers Ave.
Ft. Lauderdale, FL 33312 Contractor Contact: Steve Hillebrand Completed: April 2008 Contract Value: $170,000.00
Miami Dade Fire Rescue Training Facility: Address: 9300 NW 41st Street
Miami, FL 33138
General Contractor: MCM Corp.
Address: 6201 SW 70th Street, 2nd Floor
Miami, FL 33143
Construction Contact: Ozzy Borge
Contract Value: $300,000.00
Project start date: June/2009
Completion Date: 12/2009
Scope: 3,178 sq.ft. 234 LF. Training Pool (5' to 12' deep) with (3) tiled swim lanes, underwater lights and Gem Finish.
City Palms: Address: 480 Hibiscus Street
West Palm Beach, Florida 33401
Architect/Engineer: YKA Consulting Engineers, Inc.
General Contractor: Tower Group
Address: 405 SW 148th Ave
Suite 1
Davie, Florida 33325
Construction Contact: Jack Leander
Contract Value: $300,000.00
Start date: November 2007
Completion: June 2008
Scope: 5th Floor High-Rise Amenities Pool and Spa.
Coventant Village of Florida - Retirement Community Project Address: 9201 Broward Blvd
Plantation, FL 33324
General Contractor: The Haskell Company
Construction Contact: William "Skip" Brazell/
Project Superintendent
Contract Value: $184,000.00
Project start date: March 2009
Completion date: May 2009
Scope: 36' x 40' L shaped swimming pool, 9' octagon spa and 16' round 3 tiered fountain.
Biltmore II Hotel Pool Renovation: Project Address: 600 Biltmore Way
Coral Gables, FL
Architect/Engineer: BEA Broward Engineering Associates, Inc.
General Contractor: Structural Preservation Systems, LLC
Address: 3000 SE 10th Street
Pompano Beach, FL 33069
Construction Contact: Juan Ivanoff
Contract Value: $175,000.00
Project Start date: November 2008
Completion Date: May 2009
Scope: Remodeled of 2,692 sq.ft. swimming pool with a wet edge gutter systems, added Van Kirk brick coping, changed pool depth and installed tiled lap lanes and new collector tank.
The Peabody Hotel: Address: 9801 International Drive
Orlando, FL 32819
General Contractor: Balfour Beatty Construction
Address: 2101 47th Terrace
Bradenton, FL 34203
Construction Contact: Jim Murphy
Contract Value: $ 5,500,000.00
Project start date: September 2008
Completion Date: 01/2010
*Bonded
Scope: 13 Bodies of Water that include 4 exterior and interior hotel fountains, 4 spas, lagoon pool, wading pool, main pool with slide, and interactive kids water feature.
24 Hour Fitness, Shaq-Sport: Address: 15 West Crystal Lake Street
Orlando, FL 32806 Architect/Engineer: SMA + Architects General Contractors: Hoar Construction, LLC Address: 622 East Washington Street
Suite 200
Orlando, FL 32801 Construction Contact: Elis Curtis Contract Value: $210,995.00 Project Start Date: April 2008
Completion: 11/2008